玖玖草在线视频观看,日韩在线96,亚洲天堂1,92超碰自拍,大干欧美女♀,成年人一区二区,999精品999精品,伊青青草视频,国产18区

You path:  Home >> NEWS >> Installation Instructions-Sing...
Installation Instructions-Single End Powered LED Tube Installation
Mike  2012-08-20 03:37:38  

Installation Instructions-Single End Powered LED Tube Installation

 

WARNING!
1. It is the responsibility of the contractor, installer, purchaser, owner, and user to install, maintain, and operate the device in such a manner as to comply with all state and local
laws, ordinances, and regulations.


2. The instructions and precautions set forth in this user guide are not necessarily all inclusive, all conceivable, or relevant to all applications as The LED Light, Inc. cannot anticipate
all conceivable or unique situations and assumes no responsibility or liability for damages. It is the recommendation of The LED Light, Inc. that installation of this product be
performed by a licensed electrical professional or contractor.


Pre Installation:
1. Turn off any electrical circuit breakers that control the fixture being
retrofitted
2. Remove fixture cover according to the fixture manufacturer’s instructions.
3. Remove fluorescent bulbs from fixture
4. Test the fixture with appropriate electrical testing equipment to ensure that no
voltage is being received by the fixture


Fixture Retrofit:
1. Identify the L (Live or +) and N (Neutral or -) lead wires coming into the
fixture from your electrical system. (See Figure A)
2. Leave the N (Neutral or -) wire connected directly to the tombstone socket as
shown in Figure B (NOTE: We will be referring to this side of the fixture
as the “Input Side”)
3. Cut the wire from the starter to the Input Side (NOTE: Make your cut so
that there is a length of wire left coming from the Input Side which will
be used at Step 5) (See Figure B)
4. Cut the L (Live or +) wire connected to the ballast (See Figure B)
5. Connect the L wire to the remaining wire on the Input Side (See Figure B)
6. Secure all connections and cut wires with the appropriate fastener or wire nut
7. For fixtures with multiple bulbs repeat this process connecting the main N (-)
and L (+) on the same side as your main Input Side


Installation
1. Install the bulb with the Label Side of the bulb on the same side as the Input
Side of the fixture. (See Figure C)


Post Installation:
1. You may remove the Ballast and Starter or leave them, inoperable, in the
fixture (NOTE: No connections are required on the other side of the
fixture)
2. Replace fixture cover according to the fixture manufacturer’s instructions.
3. Re-establish electrical power to the fixture at the electrical circuit breaker.

[Print]  [Close]  

Copyright© Shenzhen Longtech Electronics Co., Ltd    led t8 tubes light, t8 led tube light,  t8 led tube lighting, led t5 tube light, led tube lights t5, t5 led tubes light, t10 led tube lights, t10 led tubes light Sitemap    LED Tube light,LED Tube lamp,LED Tube Light Manufacturer  

 
 
2503564770
 
375737297
 
ete6688523
 
??????????????
 
??????????????
 
 
什邡市| 广灵县| 公主岭市| 双峰县| 西充县| 钟祥市| 南丰县| 长汀县| 湘西| 美姑县| 余干县| 铁岭市| 乐亭县| 盈江县| 桐庐县| 中宁县| 金寨县| 邢台市| 登封市| 南开区| 滕州市| 吉木萨尔县| 三明市| 杂多县| 密山市| 小金县| 太保市| 凤阳县| 平果县| 布尔津县| 呼图壁县| 丰城市| 德昌县| 中西区| 寿阳县| 颍上县| 宁远县| 宁南县| 淳化县| 哈密市| 连山|